PlanningSkills.COM Thursday, August 17, 2017 PDT

Home Page
DSSResources.COM
PowerEnterprises.Net

Content Channels:

Ask Dan!
Glossary
Library
Planning Tips
Slides
Web Links

Site Information

About Us
Disclaimer
Privacy Statement
Welcome


Throughput Time

In production, throughput time (TPT) is the average amount of time it takes to move a product through the production system. It is the time required for a material, part, or subassembly to pass through the manufacturing process. Also, sometimes called flow time, manufacturing cycle time or lead time. Throughput time can consist of many components, like process time, inspection time, move time and queue time.








Home |  About Us |  What's New
Copyright © 2004-15 by D. J. Power (see his home page). PlanningSkills.COMsm is maintained by Alexander P. and Daniel J. Power. Please contact them at djpower1950@gmail.com with questions. See disclaimer and privacy statement. This page was last modified on December 8, 2015.
Google
 
Web planningskills.com